Thursday, 25 Feb 2021
PROJECTS

Visual Guidance Docking System at Noi Bai Int’l Airport

VTD signed contract with Noi Bai Int’l Airport on June 22nd 2012 for supply, install, commissioning and training a Visual Guidance Docking System located at the Passenger Bridge No. 9 in T1 Terminal of the airport.
 
VTD signed contract with Noi Bai Int’l Airport on June 22nd 2012 for supply, install, commissioning and training a Visual Guidance Docking System located at the Passenger Bridge No. 9 in T1 Terminal of the airport. Time of contract execution is 5 months. However, VTD finished all the works on Oct. 26th 2012, earlier than the scheduled, thanks to the great efforts made by all the employees concerned.
 

 
Although contract value is not very large but it has a significant importance to the company. This is the 1st VGDS project run by VTD, however, it has been supplied, installed, commissioning successfully. In addition, we organized training and transferred technology to customer.
 
 
During installation we have suitable changes according to conditions at site, making it faster and absolute safely. We made the use of existing pipe to install control cables thus avoid cutting on surface of apron then reducing cost and time.
 
VGDS is an advanced technology for which our engineers need to be continuously trained in order to master it in the future projects without the guidance of foreign experts.
 
 
Print pageSend to friend Share on facebook  Share on twitterCommentView comments
Other projects:
List of executed projects in 2014
110KV ACCC Linh Trung – Thu Duc Bac Re-conductoring project
List of projects executed in 2015
Monitoring, installation the Sai Dong - Giai Pham project
TYPICAL PROJECTS
Hotel project Hanoi Golden Lake - Dolce by Wyndham
List of Projects executed in 2019
Handover ceremony of airfield lighting system at Gia Lam Airport
   
ONLINE SUPPORT
Sales Kinh doanh
Sales Kinh doanh
Technical Kỹ thuật
PARTNERS

 
 
 
 
 
 

 
 

Thiết kế web: OnIP™