List of Implemented Projects 2009
No. | Project name | Client | Scope of supply | Manufacturer |
1 | Overhaul 2009 | PTC2 | VT 110KV | ABB/ Sweden |
2 | Overhaul 2009 | PTC1 | 22KV cubicles | Siemens/ Indonesia |
3 | Airfield lighting system – Pleiku airport | ATTECH | Constant Current Regulator, Runway edge lights, Taxiway edge lights | THORN/ Australia |
4 | Overhaul 2009 | PTC4 | 110 KV Bushings | Trench/ France |
5 | Transformer Bushings | EEMC | Transformer Bushings | Trench/ France |
6 | Supply of Circuit Breakers 145KV | PTC1 | Circuit Breakers 145KV | Areva/ Germany |
7 | Overhaul 2009 | PTC2 | Current transformers 500KV, Voltage transformers 110KV, Surge Arresters 220KV, 110 KV, 35 KV. | Trench/ Pháp Siemens/ Đức |
8 | Supply of Surge Arresters 500KV | PTC1 | Surge Arresters 500KV | Tridelta/ Germany |
9 | Overhaul 2009 | PTC4 | 110kV Transmission Line Insulators and accessories | Sangdong/Korea |
10 | Overhaul 2009 | PTC4 | HV clamps and accessories | Sangdong/Korea |
11 | Overhaul 2009 | MiddleAirport Corporate | Spare parts of CCR and Lamps | Thorn/ Astralia |
12 | Medium Voltage capacitors | Ha Noi power company | Medium Voltage capacitors | Samwha/ Korea |
13 | Transformer production | EEMC | Transformer bushings | Trench France |
14 | Transformer production | EEMC | Transformer bushings | Trench France |
15 | Overhaul 2009 | PTC2 | Clamps Conducting wires | Sangdong (Korea), Nexan Lioas (Vietnam) |
16 | Retail | CAS | Clamps | ARRUTI/Spain |
17 | Upgrade of 220 kV Chem Substation | PTC1 | Bushings and accessories | Sangdong/Korea |
18 | Upgrade of 220 kV Pho Noi Substation | PTC1 | Disconnectors, incoming cubicles | Colme (Italia), Sangdong (Korea), Areva ( China) |
19 | Supply and installation of CT, VT | Lâm Thao | CT 110 kV VT110 kV |
Trench France Trench Italia |